Project Description

PROJECTS
Solar PV

Utility Scale Renewable Energy Plant

Renewable energy plant comprised of 3 MW (DC nominal capacity) ground mounted Solar Photovoltaic (PV) system and 1MW with DC to AC runs, disconnects at a 1% voltage drop, and Utility Interconnection. System produces 5231.5 MWh/year on average with a Capacity Utilization Factor of 19.9%, Performance Ratio of 85% and 1743.8 kWh/kWp. High performance 72 cell poly-crystalline solar panels, which are complemented by high efficiency three-phase string inverters. Optimally mounted at a 9 degree tilt using ground mount racking technology with single axis tracking to precisely follow the sun.
Design includes Integration of a 1MW, 4.2MWh BESS using 20 Tesla Powerpack 2 modules to the solar PV system to mitigate the intermittency of solar PV generation by storing excess capacity when demand is low and dispatching it when needed. The 1MW, 4.2MWh BESS provides sufficient storage capacity to maximize generation. Warner Levy Enviro Energy will provide all procurement services and construction which is pending.